Night operation can change the noise assessment of a site even without a new production line. Cooling, ventilation, loading and vehicles may remain active when the surroundings are otherwise quieter.

What the night period means

Under the Czech noise framework, night generally runs from 22:00 to 06:00. The applicable assessment depends on the source and protected space. A day-time conclusion cannot automatically be transferred to night operation.

For typical stationary-source assessment, the relevant night operating scenario must be identified. Tonal or impulsive characteristics can affect the criteria.

Sources worth considering

Scroll the table horizontally to see all columns.

SourceRelevant operating issue
Ventilation and refrigerationContinuous running or cycling
Loading areasHandling, reversing and vehicle arrivals
Production hallsOpen doors and sound transmission
Standby equipmentActual testing and operating schedule

The combined effect of relevant equipment matters. A quiet individual unit may still contribute to the total site noise.

Before changing working hours

Existing studies and permits may assume daytime operation only. Extending production or dispatch therefore calls for a review of the assessed scenario and applicable conditions.

Possible measures include relocating equipment, attenuation, enclosure or changes in logistics. Their usefulness depends on the dominant source and location of protected spaces.

We assess proposed night operation and arrange measurements or a noise study appropriate to the site.

Noise studies: request an assessment · Noise studies.