Skip to content
Studies before construction
Expert reports and EIA
Documents for the authority

At a glance

Documentation by project phase

  1. Documents before constructionFor a proposed state, a noise or dispersion study, an expert or acoustic report, an EIA or a technical annex to the project may be needed.
  2. Verification after constructionAfter technologies are installed, noise, lighting, microclimate and the workplace environment can be verified. We schedule the measurement for representative operation.
  3. What to send usFor an initial assessment, a site plan, a technical report, technology parameters, the authority's opinion, the location and the requested deadline are enough.

Practical information

Frequently asked questions

When does a construction company need a study and when a measurement?

A study usually assesses the proposed state before construction. A measurement verifies the actual state after installation or during operation. The specific requirement is determined by the project and the administrative authority.

What documents should the designer send?

For an initial assessment, a site plan, a technical report, technology parameters, operating hours, traffic and the opinions of the relevant authorities help.

Can a study and a follow-up measurement for occupancy approval both be handled?

Yes. They are, however, separate outputs in different phases of the project. It is advisable to keep updating the parameters according to the technology actually installed.

Send a brief description of your operation or an authority requirement. Based on your documents we will propose the scope of work and a possible schedule.