For designers and contractors
Studies and documentation for the project
We prepare dispersion and noise studies, expert reports, EIA and technical annexes according to the project, the technology and the authority's requirement.
- Studies before construction
- Expert reports and EIA
- Documents for the authority

Documentation and permits
View the documentsDocumentation and permits
Documentation by project phase
Verification after construction
After technologies are installed, noise, lighting, microclimate and the workplace environment can be verified.
What to send us
For an initial assessment, a site plan, a technical report, technology parameters, the authority's opinion, the location and the requested deadline are enough.
Service details
Verification after construction
After technologies are installed, noise, lighting, microclimate and the workplace environment can be verified. We schedule the measurement for representative operation.
What to send us
For an initial assessment, a site plan, a technical report, technology parameters, the authority's opinion, the location and the requested deadline are enough.
Scope and deliverables
We prepare dispersion and noise studies, expert reports, EIA and technical annexes according to the project, the technology and the authority's requirement.
How a project works
Review of documents
We review your documents, authority requirements and propose the best approach.
Scope and schedule
We clarify the scope of measurements, studies or documentation and plan timing.
Measurements and processing
We carry out measurements, calculations or document preparation as agreed.
Expert deliverable
We deliver a report, study or documentation ready for the next permitting step.
Frequently asked questions
When does a construction company need a study and when a measurement?
A study usually assesses the proposed state before construction. A measurement verifies the actual state after installation or during operation. The specific requirement is determined by the project and the administrative authority.
What documents should the designer send?
For an initial assessment, a site plan, a technical report, technology parameters, operating hours, traffic and the opinions of the relevant authorities help.
Can a study and a follow-up measurement for occupancy approval both be handled?
Yes. They are, however, separate outputs in different phases of the project. It is advisable to keep updating the parameters according to the technology actually installed.
