Facility overview

Typical issues

  • emission measurement from biomass combustion and process stacks
  • dust at crushing lines and extraction systems
  • operational and transport noise on site
  • permit and operational documentation updates

Documents to send

  • description of technology, fuel and operating mode
  • photographs of sources, stacks and workplaces
  • authority requirement or internal measurement objective
  • operating manual and decisions, if available

Deliverables

  • emission and workplace environment measurement protocols
  • documentation for KHS and regional authorities
  • follow-up expert assessments or operating manuals

Typical mistakes and risks

  • measurement outside representative dryer or boiler operation
  • insufficient description of technology and fuel composition
  • addressing emissions and dust separately without shared context

How a project works

Four steps from assessing your operation to a report and recommendations for authorities or your site.

  1. Review of documents

    We clarify output purpose for operations, authorities or the investor

  2. Scope and schedule

    We define scope for emission and/or workplace environment measurement

  3. Measurements and processing

    We carry out field measurement under representative conditions

  4. Expert deliverable

    We deliver a protocol or study with recommendations for next steps

Related services

Časté dotazy k tomuto provozu

Do you also address wood and biomass dryers?

Yes — including emission measurement from dryers and combustion sources on site.

Can emission and workplace environment measurement be combined?

Yes — we often propose a joint approach based on technology and the required output.

Send a brief operation description, technology or authority requirement. We will propose the right scope of measurements, studies or documentation.