Facility overview

Typical issues

  • unsuitable outdoor unit location relative to development
  • underestimating nighttime operating mode
  • unclear difference between verification measurement and a study
  • ineffective measures without analysis of the dominant source

Documents to send

  • heat pump / HVAC technical data sheets
  • source location relative to surrounding buildings
  • equipment operating modes (day/night)
  • occupancy approval or authority requirement

Deliverables

  • noise measurement protocol or noise study
  • impact assessment on the surroundings
  • noise control recommendations for implementation

Typical mistakes and risks

  • measurement outside a representative technology mode
  • missing inputs for nighttime operation
  • technical solution without verified effectiveness

How a project works

Four steps from assessing your operation to a report and recommendations for authorities or your site.

  1. Review of documents

    We clarify whether measurement, a study or a combination is appropriate

  2. Scope and schedule

    We set methodology and key operating scenarios

  3. Measurements and processing

    We carry out measurement or model-based assessment

  4. Expert deliverable

    We recommend technical measures and deliver documentation for proceedings

Related services

Časté dotazy k tomuto provozu

Is measurement alone always sufficient for a heat pump?

Not always. For new projects a noise study before implementation is often more appropriate or required.

Do you also design measures?

Yes — we propose technical and organisational measures based on dominant noise sources.

Send a brief operation description, technology or authority requirement. We will propose the right scope of measurements, studies or documentation.