Construction waste recycling centre: noise, dust, traffic, and EIA
A construction waste recycling centre can be a sensitive project from a permitting perspective, even though its purpose is material recovery of waste. Crushing, sorting, loading, and transport generate noise, dust, and increased traffic load, which must be assessed already at the project preparation stage.
Read articleBackup diesel generator: emissions, noise, and permitting documentation
A backup diesel generator appears in practice at industrial sites, waterworks, hospitals, data centres, office buildings, logistics centres, or technological operations where power supply must be secured during electricity outage. At first glance it may be equipment that runs only exceptionally.
Read articleBoiler plant and gas boiler: when are CO and NOx emissions measured?
For boiler plants and gas boilers, practice often raises the question of whether measurement of carbon monoxide and nitrogen oxide emissions is mandatory. What matters is not only that it is a gas boiler, but especially total rated thermal input, fuel type, source classification, and operating permit conditions.
Read articleWelding shop: dust, metals, extraction, work environment, and emissions
A welding shop can be a significant workplace from the perspective of employee health protection and air protection. During welding, welding fumes, fine particles, metal oxides, and other substances arise, whose composition depends on welded material, filler material, welding method, and extraction effectiveness.
Read articlePaint shop: emissions, VOC, operating rules, measurement and operating permit
From an air-protection perspective, a paint shop is often a significant source of VOC emissions — volatile organic compounds. The operator must address not only painting itself, but also consumption of organic solvents, filtration, exhausts, VOC balance, operating records, emission measurement and, where applicable, an operating permit.
Read articleMeasurement of chemical substances in workplace air: what determines the scope of measurement?
The scope of measurement of chemical substances in workplace air cannot be determined from the name of the operation alone or from a general request to "measure chemicals". What matters is the technology used, safety data sheets, work procedure, exposure duration, ventilation method, PEL and NPK-P limit values, and whether sampling should be personal or stationary.
Read articleWorkplace dust: total dust, respirable fraction, and silicon dioxide
Workplace dust is not just visible mess in the air or on the floor. From the perspective of employee health protection, what dust arises, what particle sizes it contains, and whether it contains crystalline silicon dioxide, for example, is important.
Read articleJob categorisation: what measurement is needed as supporting evidence?
Job categorisation is the basic tool for assessing health risks in the workplace. In practice, the question often arises when expert assessment is sufficient and when workplace environment measurement must be documented.
Read articleSummary operating records 2026: what must the operator check before submission?
Summary operating records are not just an administrative form in ISPOP. Data in the report must match the operating permit, actual source operation, emission measurements, emission calculations, fuel and raw material consumptions, and any fee obligations.
Read articleWorkplace environment measurement: when can KHS require it?
The regional hygiene station may require workplace environment measurement especially when it is necessary to verify employee exposure to risk factors of work. Chemical substances, dust, noise, vibration, microclimate, lighting or documentation for job categorisation are most often addressed.
Read articleHow to read a noise study: LAeq, LAFmax, protected area and uncertainty
A noise study or noise measurement report contains terms that may be difficult for the client to read: LAeq, LAFmax, day and night periods, protected outdoor area of buildings, or measurement uncertainty. Correct interpretation is important because not every high number automatically means limit exceedance.
Read articleNoise from heat pumps and HVAC units: what to address before building completion?
Heat pumps, outdoor air-conditioning units, roof-mounted HVAC units, fans and chillers are among the common noise sources addressed before building completion and after the building is put into operation. The problem usually arises not only from the noise level of the equipment itself, but also from its location, night-time operation, reflections from façades, simultaneous operation of several units, and distance to the nearest protected areas.
Read articleSend a decision, notice or brief description. Based on your documents we will propose next steps.