Air source permitting: changes in 2026
2026 is important for air protection mainly because of the practical impact of the amendment to the Air Protection Act No. 42/2025 Coll.
Read articleMeasuring point: plan it in the project phase
A measurement location on the exhaust is not just a technical detail for the laboratory. If authorised emission measurement is to be carried out in future, the exhaust must be accessible, safe and suitable for representative sampling.
Read articleEmissions vs. immissions: differences, limits
Emissions and immissions are two different perspectives on air pollution. Emissions describe what a source releases through a stack, exhaust, or technological area.
Read articleWhat to send for a quick project assessment?
A quick project assessment is only possible when basic information is available on the building, technology, capacity, exhausts, operating hours, transport, and the authority's requirements. Complete project documentation is not always needed immediately, but the materials must make it possible to determine whether measurement, a noise study, a dispersion study, an expert opinion, EIA, JES, operating rules, or other environmental documentation will be required.
Read articleWhy catalogue noise data is not enough
A catalogue value for equipment noise is a useful orientational input, but on its own it usually is not enough for professional noise assessment. What matters is whether the manufacturer states sound power level or sound pressure level, at what distance the value was determined, under what operating regime, with what directivity, and with what uncertainty.
Read articleDesigner vs. environmental consultant
For industrial and technical projects, resolving only the building and technology part is not enough. Already in an early phase, exhaust placement, noise sources, traffic routes, protective setbacks, and operating capacity may decide the outcome.
Read articleIndustrial permit: documents you need
Permitting an industrial operation from an environmental perspective usually does not address just one area. Depending on the type of project, it may be necessary to assess air quality, noise, waste, water, EIA, the unified environmental opinion, operating rules, expert reports and dispersion studies.
Read articleAutomotive plants: what is measured
Automotive operations combine many technologies that can affect the work environment, air emissions, and noise in the surroundings. Painting, bonding, component covering, PUR foams, flame lamination, welding, chemical substances in workplace air, VOC, dust, metals, and technological noise are typically addressed.
Read articleWood processing: dust, emissions and noise
Wood-processing operations are typical sources of dust, sawdust, noise, and emissions of total suspended particulates (TSP). During cutting, planing, sanding, milling, or production of chips and pellets, wood dust arises that matters both from a work environment perspective and from an air protection perspective.
Read articleLandfill and waste site: documents
Landfills and waste facilities are among projects where not only waste management itself is usually addressed. Capacities, instantaneous capacity, waste types, operating rules, noise, air, water, traffic, EIA, and for larger facilities also IPPC are important.
Read articleRecycling centre: noise, dust, traffic, EIA
A construction waste recycling centre can be a sensitive project from a permitting perspective, even though its purpose is material recovery of waste. Crushing, sorting, loading, and transport generate noise, dust, and increased traffic load, which must be assessed already at the project preparation stage.
Read articleBackup diesel generator: emissions and noise
A backup diesel generator appears in practice at industrial sites, waterworks, hospitals, data centres, office buildings, logistics centres, or technological operations where power supply must be secured during electricity outage. At first glance it may be equipment that runs only exceptionally.