Knowledge base – Page 3

Practical guidance on measurements, permits and operators' responsibilities.

78 articles — newest first

Documentation and permits

EIA notification: what it is, when needed

Project notification is an expert supporting document with which a business, investor, or municipality initiates the process of assessing the environmental impacts of a planned project. It is typically addressed for industrial operations, recycling facilities, warehouse sites, energy sources, agricultural operations, transport structures, mining, waste facilities, or major changes to existing operations.

Read article
Documentation and permits

Tonal noise components and Czech legislation

The tonal component of noise is important for operators because it worsens noise assessment even when the overall level in dB does not appear high at first glance. It typically concerns fans, compressors, pumps, cooling, cogeneration units, transformers, ventilation, extraction, heat pumps, or production technologies.

Read article
Measurements

Cogeneration unit: emissions, noise, permit

A cogeneration unit can be an advantageous source of electricity and heat for the operator, but from the permitting perspective it is not just technical equipment in a boiler plant or container. It is necessary to address emissions from the combustion engine, flue gas discharge, emission measurement, noise to surroundings, operating hours, fuel, chimney, relationship to existing sources, and authority requirements.

Read article
Measurements

Isocyanates: training and air measurement

Isocyanates appear in operations mainly in PUR systems, two-component coatings, hardeners, adhesives, foams, sealants, and some repair or maintenance activities. The operator must know which products contain isocyanates, whether mandatory REACH training applies, what requirements are stated in safety data sheets, and whether employee exposure needs to be verified by workplace air measurement.

Read article
Measurements

Gas boiler plant 0.3–50 MW: emissions, permit

For a gas boiler plant it is not enough to know only the number of boilers and their output in kW. For air protection obligations what matters most is especially **total rated thermal input**, fuel, number of boilers, common chimney, operating hours, and whether it is a new source, boiler replacement, or change to an existing boiler plant.

Read article
Documentation and permits

Dust control on construction sites: records

Dust from construction, demolition, earthworks, or traffic on the site can be a problem already at the permitting stage. The authority may require a specific and verifiable description of measures, not just a general sentence that dust will be limited.

Read article
Documentation and permits

Material stockpiles: permit, study, report

Storing bulk materials on site can be an air protection issue even when there is no stack, filter, or production technology involved. What matters is what is stored, on what area, how the material is handled, whether dust arises, and whether the area is actually covered by the operating permit.

Read article
Measurements

Bulk materials: when a source needs a permit

An area with soil, aggregate, recyclate, rubble or other bulk material may not be just a routine storage area. 1 of the Air Protection Act.

Read article
Measurements

Workplace vs. outdoor noise measurement

Workplace noise measurement and environmental noise measurement are not the same thing. Workplace noise is addressed to protect employees, for job categorisation and requirements of KHS in the area of work environment.

Read article
Measurements

Job categorisation after technology change

Job categorisation must correspond to actual conditions at the workplace. If a company changes technology, work procedure, chemical substances used, shift pattern, ventilation or time employees spend at an exposure source, old measurements may no longer be usable.

Read article
Measurements

Vibration measurement: hand-arm, whole-body

Vibration in the workplace is not assessed only in general terms. Hand-arm vibration transmitted during work with hand-held tools is evaluated differently from whole-body vibration acting on the body, for example when operating a forklift truck, construction machine or other mobile equipment.

Read article
Measurements

Microclimate: temperature, humidity, airflow

Microclimate measurement is addressed where employees experience heat, cold, draughts, dry air or significant differences between parts of the workplace. During measurement we evaluate temperature, humidity, air movement and related operating conditions so that the workplace environment, thermal or cold load and suitability of technical or organisational measures can be assessed objectively.

Read article