Powder coating shop: permit and TSP tests
11 “Application of powder plastics”. The operator needs an operating permit and operating rules.
Read articleAnnual operating records: common errors
The annual summary operating records form F_OVZ_SPE is submitted every year through ISPOP for listed stationary sources. The most common problems do not arise when the form is submitted, but from inconsistencies between the operating permit, the actual technology, the numbering of sources and vents, the emission measurement reports and the reported annual emissions.
Read articleNight-time site operation: noise sources
Night operation is considerably more demanding in terms of noise than daytime operation. For common stationary sources, a limit of 40 dB is generally assessed in the protected outdoor space of buildings, or 35 dB where a tonal component is demonstrated.
Read articleCold stress at work: measurement and records
Work in a cold store, freezer room or unheated hall may require measurement of microclimatic conditions, adjustment of the work regime, protective clothing, safety breaks and inclusion of the cold stress factor in job categorisation. The decisive factors are the temperature, air movement, the energy demand of the work, the length of exposure and the alternation between time spent in warm and cold conditions.
Read articleCosts: expert report, study, operating rules
The price of the documents for permitting an air pollution source depends on the type of technology, the number of sources and stacks, the extent of emissions and the quality of the available documentation. A simple gas boiler or a smaller paint shop requires a different scope of work than a production site with several technologies, filters and dozens of emission outlets.
Read articleOperating rules: duty and approval
The operating rules set out the binding conditions for operating a selected air pollution source, the rules for operating and inspecting the equipment, procedures in the event of faults and measures to reduce emissions. The obligation to prepare operating rules does not apply to all listed sources.
Read articleHeat stress: measurement and work time
High temperatures in a production hall, work at a furnace or summer operation at an outdoor workplace may require heat stress measurement and the determination of the permissible working time, safety breaks and protective drinks. The result also depends on the energy demand of the work, work clothing, radiant heat, air movement and shift length.
Read articleNoise control before a noise measurement
How to identify the main noise source and choose an effective measure before measurement. A practical overview for premises, ventilation systems, compressors and other technologies.
Read articleTechnology change: air, noise, waste, EIA
Replacing a production line, increasing capacity, a new vent or extended operating hours may require an amendment of the operating permit, a dispersion or noise study, adjustment of waste management or a review of the project under the EIA Act. It is therefore advisable to address environmental requirements before the technology is ordered and the project is completed.
Read articleUnified environmental opinion: documents
What to prepare for a JES application, why proceedings get delayed and how to align the documents for air, noise, water, waste, agricultural land, nature and a possible EIA.
Read articleIPPC: when an integrated permit is needed
An integrated permit does not apply to every industrial operation. It mainly concerns larger installations in energy, waste, chemicals, metal processing, the minerals industry, food processing and intensive livestock farming.
Read articleBackup diesel: backup or regular source?
A backup diesel generator is often acquired for the event of a power outage. It is typically found at data centres, hospitals, waterworks, industrial sites, office buildings, or critical infrastructure facilities.